GlaxoSmithKline plc, Slough
Effluent generated from the manufacture of Horlicks. Crude effluent
standards: Volume 800m3/day, pH 6 to 11 and temperature <43 degrees
centigrade.
Total Project Cost STG £291,000 (Constructed in 2001)
Outline Of Plant pH Correction and temperature control system
Outline Of Project msa input to design and oversee the installation of a pH and temperature control system to ensure that the trade effluent discharged complies with the consent limits enforced by the local water company, Thames Water.
|