North Kerry Milk Products, Listowel
The largest dairy effluent treatment plant in Europe (multi-product
including butter, spreads, cheese, whey powder, special
ingredients,etc.).
Crude effluent standards: Loading: 35,000 kgCOD/day Volume: 9,000 m3/day Final effluent standards: 25:30 (BOD:TSS)
Total Project Cost IRE £400,000 (re-constructed in 1989)
Outline Of Plant Anoxic tank, improved aeration systems, tertiary sand filters, additional settlement tank, with the existing plant containing balancing tank, anaerobic digester, high rate filter, and activated sludge tanks.
Outline Of Project msa were called in following the catastrophic failure of a new IRE£2.0 million effluent treatment system. Several design errors were found which necessitated the addition of the plant listed above. Competitive tenders were obtained for all items of plant with full technical assistance provided throughout installation.
|