Yeo Valley
Newton Abbot, UK
Yeo Valley
Davidstow, North Cornwall
Yeo Valley working with MSA identified an onsite effluent treatment solution to eliminate costly off-site tankered disposal.
LOREM IPSUM
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse.
LOREM IPSUM
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse.
LOREM IPSUM
Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Ut enim ad minim veniam, quis nostrud exercitation ullamco laboris nisi ut aliquip ex ea commodo consequat. Duis aute irure dolor in reprehenderit in voluptate velit esse.
THE CHALLENGE
Yeo Valley produces branded & own label chilled desserts and ice cream at the site in Newton Abbot, Devon.
Historically, Yeo Valley was collecting all trade effluent for offsite disposal using tankers.
With projected production increases and continued tankering costs, this became financially unviable as a long-term effluent disposal plan.
WHAT WE DID
From Concept to Commissioning.
In October 2020, we completed an effluent options review for the site that provided a comprehensive assessment of the available options for dairy effluent treatment, including pre-treatment as well as CAPEX and OPEX estimates.
We developed the concept design provided as part of our Effluent Strategy Review and prepared a Functional Design Specification (FDS) and associated drawings for the required primary effluent treatment system. This enabled Yeo Valley to obtain firm and fixed prices from suitable Contractors on a ‘like for like’ basis against the same scope of supply.
The scope of the Functional Design Specification (FDS) was agreed with Yeo Valley at the outset and the primary treatment items raised by MSA within our Effluent Strategy Review report plus additional agreed items.
The scope of this project was as follows:
- Crude effluent screening
- Balance Tank (200 m³) with mixing and aeration
- Crude effluent divert system
- Instrumentation for monitoring and control
- Forward feed pump set from Balance Tank to DAF plant
- A DAF pipe flocculator
- A new DAF plant (c. 11 m³/hr)
- Chemical Dosing & Storage
- DAF Sludge Storage
THE OUTCOME
Civil and Environmental were awarded the DAF Project Contract in October 2021.
Plant operation began in August 2022 with Yeo Valley able to discharge treated effluent to the sewer and eliminate tankering costs. The plant is part of Yeo Valley’s long term environmental .
Project Gallery
MSA provided a range of consultancy services throughout this project for our Newton Abbot site including identification of an appropriate effluent treatment solution, providing the outline design package for competitive tendering and retained consultancy throughout the installation and commissioning phases. The installed plant has met its objectives and critically, has enabled the site to achieve a discharge to sewer within the SWW trade effluent limits and enabled a reduction in operational costs. Overall, MSA provided Yeo Valley with a highly professional and responsive service backed up with suitable technical expertise and were a key member of the ETP project team.
Tristan Holloway, Group Head of Engineering